Develop appropriate control charts and determine whether there is any cause for concern n the cutting process. Plot the information and look for patterns.
Your current equipment is fully depreciated and can produce the 2,000 units per year at a margin of only $4.00 per unit. Should you purchase the new equipment? Under what conditions?
Using the times below, determine the optimal order in which the jobs should be sequenced through the two processes.
The following table contains information regarding jobs that are to be scheduled through one machine: What is the first-come, first-served (FCFC) schedule?
Why is it important for a firm to be able to anticipate new trends or changes in the environment and how these changes might affect their marketing plan?
How many commercial messages should be run on each medium to maximize total audience contact? What is the allocation of the budget among the three media, and what is the total audience reached?
Develop minimum cost aggregate plan and compute the total cost of the plan. Use regular production, inventory, overtime and subcontracting as needed.
For your simulation, if a random number of 15% was generated for the weekly demand of milk, what value of demand would correspond to this random value?
Determine the number of grape and the number of apple pies that will maximize revenues if the couple working together can make an apple pie in six minutes and a grape pie in three minutes.
How many Kanbans are required for the bakery? b) What is the maximum authorized router inventory? c) If the average setup and processing time is reduced to 3/8 of a day due to better training and re
Develop a production plan and calculate the annual cost for a firm whose demand forecast is fall, 10,000; winter, 8,000; spring, 7,000; summer, 12,000.
Which design type-mechanistic or organic-best fits Starbucks and why? Is Starbucks a servant leader in its industry? Justify your response.
Using either of these two numbers discuss the status of the project and if the project manager needs to take corrective actions. Justify your comments.
Write a brief analysis of the status of the project at this time, including task level, project level, and critical path.
A newspaper advertisement is read by about 150,000 persons. Formulate Segal's goal programming problem to find out how many of each type of ad to place.
Calculate the expected duration and variance of the critical path. Calculate the probability that the project will be completed in fewer than 30 time units.
What impresses you about this company? What aspects of Wal-Mart do you find unimpressive? What accounts for Wal-Mart's success over the past 20 years?
Assume that only purchasing costs are being considered. Which machine would have the lowest total cost, and how many of that machine would be needed?
Medical instrumentation labs produces a "diagnostic emergency pac" in lots of 120 units. the production lead time is three weeks, depict the use requirements in a time phased order point format for a
Calculate the Estimate At Completion (EAC) considering future performance will be back on schedule and budget. Calculate EAC considering that the project will continue to perform as it has to date.
The following data were obtained from a project to design a new software package: Calculate the Cost and Schedule Variances and Indexes (CV, SV, CPI, SPI) for tasks A, B, C, D, and E.
Medical instrumentation labs produces a "diagnostic emergency pac" in lots of 120 units. depict the use requirements in a time phased order point format for a 10 week period