Your budget for this project is $275,000, and you have already spent $120,000. What is your cost performance index?
Total indirect costs for 13 days of project duration: $ 100 At what project duration do we achieve the lowest total project cost (i.e., direct plus indirect costs)?
Consider the following data for a five-job, 2-machine, flow-shop problem. Find the value of make-span (minimum time to complete all jobs) using the sequence ABCDE.
The second has two identical machines , each of which can process a unit in 12 minutes. The third station can process a unit in 8 minutes. Which station is the bottleneck station?
Describe why or why not a pure service industry (e.g. accounting or law firms) may or may not be able to implement this type of technique.
A re-organization will require that some employees are provided severance packages while other reassigned. What interpersonal managerial roles developed by Mintzberg will a manager confronted with t
What are the main objectives of work-center scheduling? What are the differences among job shop, Group Technology cell, and flow shop?
Also, new errors seemed to be cropping up in the computer programs that came out of Joan's section. Should companies demand that individuals not reveal their salaries? Why or why not?
Assuming the supplier's promise is valid, what is the probability that the store will run out of this flavour before the shipments arrives?
How many tires should Rocky Mountain order each time it places an order? What is the total cost of this policy? Justify your answer and show calculations.
What is the productivity of the processing facility, with the equipment currently in use? What might happen if energy costs increase in the future?
From the following information, develop an AON project network. Complete the forward and backward pass, compute activity slack, and identify the critical path. How many days will the project take?
Prepare a Product-by-Value Analysis for the following products and given their position in the Product Lifecycle, identify the issues likely to confront the Operations Manager and his or her possibl
Construct a Cost-Benefit Analysis matrix for an organization that is considering replacing its internal payroll system with a payroll outsourcing service.
What is the current maximum output of the process? How long will the picking and packing operations have to work if we have a day with the maximum orders?
In the regular market place I am free to send out literature that entices you to buy my product. Should you restrict e-mails that I want to send out to do the same thing?
Determine the optimal number of bolts (i.e., optimal lot size) for the plant to purchase and the time between placement of orders?
improve quality so that only 10 percent are defective, or (3) reduce labor, material, and overhead costs by 10 percent. Which option has the greatest impact on the multifactor productivity measure?
What is the maximum number of application per hour that can be handled by the present configuration of the process? How would you suggest modifying the process to accommodate 120 application per hour?
The available resources that you have are 40 units of cloths, 60 units of leather, and 240 hours of time (labor). How many Product A's and how many Product B's should you make if you want to maximize
Length of the bracelets, it has been decided to keep 25 percent of the needed inventory as safety stock. How many kanban card sets are needed?
what are the behaviors that create conflict within a team? How did you reach that conclusion? What resources might you have used to better understand the team behaviors?
The manufacturer and the buyer. Which acceptance number is most desirable from the manufacturer's viewpoint. You may use the following OC curve to find the answer.
However, a participative approach to safety improvement means employees time away from their duties and decreased productivity. Do you think the trade-off may worth it? Why or why not?
Explain the logic behind how MRP's gross-to-net calculations are processed. What input files are included in this process?