Start Discovering Solved Questions and Your Course Assignments
TextBooks Included
Active Tutors
Asked Questions
Answered Questions
Develop a Pareto chart to identify the more significant types of rejection. Examine the causes of the most significant type of defect, using a cause-and-effect diagram.
Tuition will be $200 per semester credit, which is supplemented by state support of $100 per semester credit. What is the multifactor productivity ratio? Did productivity increase or decrease for the
Formulate the problem as a linear programming model, where Glue-all Industrial would like to achieve the highest possible profit if the profit on a liter of IC-100 is R3000, and the profit on IC-200
Describe the issues: management decision-making, ethical considerations, and the responsibility of health care providers in patient data security related to the implementation of HMIS.
From your own experiences, what process improvement or (re)engineering techniques have you observed? What are some of the more challenging points of negotiation when purchasing an ERP system?
A research analyst performs database searches for a variety of clients. According to her log, a new search requires approximately 55 minutes. How many more searches will it take until the search engi
What are other non-law enforcement organizations that we look to for protection? How do they also "protect and serve" and how do they differ from law enforcement AND private security?
What steps/actions would an organization take to determine whether the supply management operation has the appropriate internal competencies to achieve competitive advantage?
Suppose that the firm operates 300 days per year. How many units of inventory must their storage area be able to hold?
The process is known to operate at a mean thickness of 3.0 mm. What is the Cpk for this process? About what % of all units of this liner will meet specifications?
Is this process capable of producing DRAM chips to specifications? In other words, calculate the Cp and Cpk and draw a conclusion with explanation.
Thirty-five samples of size 7 each were taken from a fertilizer bag filling machine. Determine the upper and lower control limits of the X bar chart where the standard deviation is = 3.
A list of 7 defects that lead to defects and the number of occurrences in a printed-circuit-board assembly line appear below: Prepare a Pareto analysis the data.
The standard deviation of lead time is 1.5 days. Assume 260 days in the year and an average lead-time of 6 days. What is the EOQ?
Annual demand is 2500 computers, annual inventory carrying cost as a percent of unit cost is 30% (due to problems with obsolescence), and ordering costs are $25 per order. What is Total Annual Inven
Assume 260 days in the year and a constant lead-time of 15 days. If a service level of 97% is desired during the reorder interval, what is the reorder point?
Annual demand for an item is 50,000 units. The holding cost rate is 45% of the item cost. Ordering costs are $50/ order. What is the optimal order quantity? If necessary, round to the nearest whole nu
What is the probability that the supply of circuit boards will be exhausted before the order is received if boards are reordered when the amount on hand drops to 625 boards.
This year's cost of goods sold will be about $32.5 million. Assuming 52 business weeks per year, express total inventory as Weeks of supply and Inventory turns.
The paint department has a daily capacity of either 150 chairs of 110 desks. Given that the profit per chair is $50 and that of the desk is $100, determine the optimal production mix for the company
Formulate an MCNFP that can be used to maximize Braneast's daily profits. (Hint: Each node in the network represents a city and a time. In addition to arcs representing flights.
Select the PERT technique you consider MOST valuable when altering or enhancing steps associated with reengineering. Explain your choice.
What are the implications of a shortage (stockouts) of a surgical kit or part package discovered several hours before the operation? What it a part package has a missing part that it not discovered
Draw a network diagram and show the critical path. What is the earliest time, the above project can be completed?
What is the production rate (output per hour) for each alternative? What is the labor productivity (output per labor hour)?