Deterministic estimate of the length of time required to complete it in weeks. Draw the precedence network for this project, with the activities on the arrows.
State the resources you believe have been overloaded in your company and give your opinion why resources become overloaded. Suggest some solutions to solve this issue.
Describe what approach you would take and the steps you would follow to develop the plan. In recognition of the Super Bowl this week, please pretend that your project is to plan a Super Bowl party f
There is considerable evidence that getting the correct operating conditions is more important than the choice between MRP, kanban, or reorder point methods in the MPC system.
Assess the approximate proportions of Frederic's time that is spent on long-term and on short-term issues. Do you think this is typical of Operations Managers in other industries.
Analyze the many things that Frederic does during his typical day. You should group these in terms of the five categories below.
The average patient receives 12 medications per day. Compute the average dpmo for each of the three categories of medication errors. To what sigma levels do these values correspond?
Based on the costs that have been calculated, a net savings should be evident to allow for major or minor cost savings for JVA Corp.
Compare and contrast this plant with the building requirements of a water purification plant located in the Red Sea.
The allowance factor is 8%. What is the standard time per unit? a. 0.42 min, b. 16.0 min c. 17.4 min d. 20.0 min. e 21.7 min
Given the following amount of work in seconds required at each station. What is the possible daily output of this "process" if 8 hours of processing time is available each day?
What is the expected completion time for the project? If you will save $1,000 for each day that the earliest completion time is reduced, which action, if any, would you choose?
A construction project is broken down into 10 activities: Draw the network diagram. Find the critical path.
The variable cost to produce each unit will be $15 and the selling price for the finished product will be $30. Which of the following best describes the situation the firm is facing?
Which one of the following is not a major factor distinguishing service design and development from manufacturing design and development?
Use standard symbols for decision tree construction, and label all parts of your diagram carefully. To simplify, assume that business in the first year, and in the second, can be only "good" or "bad
Recently, the production facility has been producing 950 boards per day. Compute the design and effective capacity utilization measures. What do they tell you?
Each location has been evaluated relative to the factors on a five-point scale. These numbers are shown here. Use factor rating to help the restaurant decide on the better location.
The Quick Copy center for document copying is deciding where to locate a new facility. If demand is expected to be 3000 units, which location is best?
The total output from a production system in one day is 700 units and the total labor necessary to produce the 700 units is 350 labor hours. What is the partial labor productivity?
Assume bankruptcy cost is 100, which will fall upon the bondholders. Further assume zero interest rate. Without risk management, what is expected debt value, equity value and firm value?
What is NPV of this project without risk management? Suppose Lyon Co. can hedge its earnings to fix earnings at the expected value of $325m. What's NPV in this case?
What's Jack's utility with this flat salary? With stock option plan with "y" calculated from (4), will Jack hedge gold price risk? Justify your answer with calculation.
Find the optimal solution using the graphical solution procedure. How many gloves of each model should Western Sports manufacture?
If 'good' students are those who get 90 and above, can the professor conclude that good students finish the test randomly (use a 5% level of significance)?