5 write a c program to find the sum of 0123 103 and 0456 102 and write the result in three significant
what is the use of knowledge of risk acceptance to engineers the past experience and historical data give better information about safety of
how will an engineer assess the safety the risks linked to a project or product must be identified the purposes of the project or product must be
q consider a program which computes the square root of an input integer between 0 and 5000 determine the equivalence class test cases determine the
q calculates function point value for a project with the following domain characteristicsno of ip 30no of op 62no of user inquiries 24no of files
q a software project is planned to cost 95py in a period of 1 year and 9 months calculate the peak manning and average rate of software them build
q consider a project for which the manpower requirement is 200 py and the development time is 2 years calculate the peak manning timeans software
a define annual change traffic act and annual maintenance effort ame of boehm modelb for a software system of 90 kloc 5kloc of code was added the
q presume a program will experience a total of 200 failures preliminary failure intensity is 16 failure cpu hr it has currently experienced 50
q define the failure intensity of the basic modelans the failure intensity of the basic model islambda mu lambda0 1 - mu v0where lambda0 is the
q assuming the putnam model and given s 100000 c 5000 and d0 15 calculate the development time td ans in putnam modelsc 3 d0td7lhs 203
q drive an expression for peak manning of a project using nordes - rayleigh equation ans norden rayleigh curve utilized to approximate software
q what do you mean by configuration managementbecause of several reasons software changes during its life cycle consequently of the change made
q illustrate the relationship between time and costin software projects time cannot be freely exchanged against cost such a trade off is limited by
q explain the relationship between productivity and difficultyproductivity refers to metrics as well as measures of output from production processes
q describe design walk throughs and critical design review ans a design walkthrough is a excellence practice that allows designers to acquire an
q describe design walk throughs and critical design reviewans a design walkthrough is a excellence practice that allows designers to acquire an early
q what is verification ans verification is the procedure of determining whether the output of one phase of software development conforms to that of
q explain iterative enhancement modelthis model incorporates modification in the software based on the analysis of the existing system as well the
q write short notes on quick-fix modelquick-fix model this is the simplest model utilized for the maintenance of the software in this model
q define reverse engineering what are the main objectives of reverse engineeringans the reverse engineering is the procedure of generating
q illustrate about system testingsystem testing this testing centred on validating the product with respect to software specification document
q explain different type of testing toolsa test case generators these tools produce test cases from srs program or test design languages they utilize
q what are the advantages of using testing toolsans the merits of testing tools are they improve the productivity and quality of software development
q briefly explain integration testingintegration testing in this the module are methodically integrated and tested to find protocol design error