explain software testing why is it important to conduct the testing of software software testing is verifying if software meets the customers
how do you differentiate the roles of quality assurance manager and project manager quality assurance manager qa manager produces the process to be
describe how to perform risk analysis during software testing while a test plan is being formed risks involved in testing the product are to be taken
how do you develop a test plan and schedule describe bottom-up and top-down approachesa test plan is contract among the testers and the project team
what is the difference in writing the test cases for integration testing and system testingintegration testing is done at module level when lots of
what are the roles of glass-box and black-box testing toolsglass box or white box testing is the method of giving ip to the system and checking how
what is the value of a testing group how do you justify your work and budgettesting is a method used for revealing defects in sw and for establishing
determine the common problems with software automationthe biggest concern is the cost incurred for test automation also often sw test automation
explain how to define severity rating in your project severity rating is a combination of three factors- the frequency of the problem occurrence it
explain the concept of decision tablesdecision table models complex logic into precise yet compact waya decision table lists causes and effects in a
what is equivalence partitioning equivalence partitioning ep is the process of methodically decreasing the huge set of possible test cases into a
explain the evolutionary modelideal for software products that have their feature sets redefined during development because of user feedback and
explain the incremental modeliterative and incremental models follow more or less the similar approach incremental model is an intuitive approach to
explain the iterative modelevery release of iterative model is developed in a specific fixed time period known as iteration each iteration focuses on
explain the phased waterfall modelit is a type of waterfall model where the project is separated into small phases and delivered at intervals by
describe how to perform risk analysis during software testing whereas a test plan is being formed risks involved in testing the product are to be
difference between pilot and beta testingpilot testing includes having a group of end users try the system prior to its full deployment in order to
what is requirement traceability explain its importancerequirement traceability is mapping of needs to test cases there are two major traceability
difference between verification and validationverification is static whereas validation is dynamic this means in verification the sw is inspected by
what is configuration managementsoftware configuration management scm is the task of tracking and controlling alters in the software configuration
what is big-bang waterfall model big bang model of sw development is based on the big bang theory a huge quantity of people money and time are put
explain the difference between latent and masked defect latent defect is one which has been in the system for a long time but is discovered now ie a
what are white-box black-box and gray-box testingwhite box or glass box testing is the method of giving ip to the system and checking how the system
explain in detail about software maintenancesoftware maintenance is an action in which program is modified after it has been put into usemaintenance
discuss in detail about delphi methodprocedurethe co-ordinator represents a specification and assessment form to each expertco-ordinator calls a