Lead time = one month sales price = $40 per unit product cost = $30 per unit Determine the order quantity and the reorder point under the assumption that all demands are backordered.
If the sample average was 25 defects per bolt, then the 3-sigma upper and lower control chart limits for this process would be (which one is correct)
The process that produces the product has a mean of 4.995 inches and a standard deviation of 0.01 inch. According to the process capability index for this process (which statement is correct)
Within 20 years, we will have seen the emergence of enormous global markets for standardized consumer products. Do you agree or disagree with this statement? Justify your answer.
Compute the multifactor productivity measure for each of the weeks shown for production of chocolate bars. What do the productivity figures suggest?
His cost to carry one unit is $100 per year per unit, and he has estimated that each order costs $25 to place. Using the EOQ model, how many should Ray order each time?
Within what values will 95.44 percent pf sample means of the process fall, if samples of n=16 are taken and the process is in control (random)?
Formulate a balanced transportation problem to minimize the daily cost of processing checks. Only formulation. Do not solve. Complete formulation must be presented.
Compute the multifactor productivity under each system. Use carts per dollar cost (labor plus equipment) as the measure.
Many managers describe performance appraisal as the responsibility that they like the least. Why could it be done to improve the situation? Explain clearly and specifically.
Compute the forecast for 11th month using Exponential Smoothing Method in case the smoothing component, α=0.20.
Prepare a case by a conservative plant manager for maintaining the status quo until the returns are more obvious.
To what extend do you agree with the assertion that "in managing people in the current working environment, there is no need for the Scientific Management concept and the Theories X and Y"?
Assuming that a new battery has just been installed and the student brings one spare, fully charged battery with him, what is the probability that the laptop will perform reliably during a one-hour
The maximum daily demand is 550 sheets and 580 bars. Profit per ton is 40 per sheet and 35 per bar. What should be the optimal daily production mix?
A part that connects two levels should have a distance between the two holes of 4. Calculate the control limits, plot the control charts, and determine if the process is in control.
Discuss the historical origins of mental health services in the United States. Have students discuss how mental health services have changed in recent years.
what do you think happens in a company that creates teams just for the sake of having teams because it's a fad or just because it sounds good? how can this pitfall be avoided?
Set up the equations that can be solved to maximize the profit per week. What is the optimal solution? How many of each product should be made, and what should the resultant profit be?
Prepare a 1,050- to 1,400-word paper about the planning function of management. Various levels of management must plan differently (for example, senior management and front-line managemen
Corporate social responsibility issue (for example, fraud, pollution, public policy, etc). How might the new strategic planning have impacted the planning done by managers throughout the company?
if Jill is willing to increase the number of replenishment orders per year to six how do Q and r change? explain difference in r.
The company uses a stock-out cost of $400 per display and 40% of annual interest rate is used to compute holding costs. HK works 52 weeks in a year.
Sub-contracted to outside air carriers at a contribution of $0.20 per ton mile. What ‘‘mix'' of aircraft should be purchased if the company desires to maximize its contribution per day?
What are the values of the Cost Performance Index (CPI), and Schedule Performance Index (SPI) for this project?