a firm wishes to determine the efficiency and utilization of a work center composed of 3 machines each working 16 hours
a work center consisting of 3 machines operates 40 hours a week in a 4-week period it actually worked 360 hours and
1 what is the responsibility of production activity control2 what are the major functions of planning implementation
to plan the flow of materials through manufacturing what four things must production activity control know where will
1 what should production activity control check before releasing a shop order2 what is manufacturing lead time name and
1 what is operation overlapping what is its purpose2 what is operation splitting what is its purpose3 what information
an order for 100 of a product is processed on operation a and operation b the setup time on a is 50 minutes and the run
an order for 200 bell ringers is processed on work centers 10 and 20 the setup and run times are as follows it is
in problem 62 what percent of the time is the order actually runningproblem 62an order for 100 of a product is
an order for 100 of a product is processed on work centers a and b the setup time on a is 50 minutes and run time is 5
shop order 7777 is for 600 of part 8900 from the routing file it is found that operation 20 is done on work center 300
bottlenecks exist in many business processes that serve the public and are usually indicated by lineups choose a
1 what is the definition of throughput2 what are the six bottleneck principles discussed in the text3 what are the five
an order for 100 of a product is processed on operation a the setup time is 50 minutes and the run time per piece is 9
an order for 100 of a product is run on work center 40 the setup time is 4 hours and the run time is 3 minutes per
in problem 612 what would be the manufacturing lead time if the second machine could not be set up until the setup on
bill builds benches in a small shop and he plans to operate five 8-hour days per week each bench has two ends and a top
parent w requires one of component b and two of component c both b and c are run on work center 10 setup time for b is
with this information justin calculated the total standard time required to be within the 320 hours available is he
1 perform a supplier rating analysis for the situation include at least ten factors and four possible locations2 make
1 why is it important to select the right supplier and to maintain a relationship with him or her2 name and describe
a company is negotiating with a potential supplier for the purchase of 10000 widgets the company estimates that the
1 prepare a transparency to be used in class to make a selection for a year-end get-together2 lead a discussion to
1 the text describes three characteristics of demand name and describe each2 describe trend seasonality random
1 what is a seasonal index how is it calculated2 what is meant by the term deseasonalized demand3 what is meant by the