Start Discovering Solved Questions and Your Course Assignments
TextBooks Included
Active Tutors
Asked Questions
Answered Questions
consider the rocket on a test stand as described in chapter 3 of the lecture notes the nose of the rocket is fixed the rocket is of length l
qusetion a body when projected vertically up covers a total distance s during its time of flight if we neglect gravity then how much distance the
1 produce the sw parts for the lugs connector and tubes produce an assembly to fit at the designated points2 create your own individual blank
consider radar with a prf of 5 khz what is the maximum unambiguous range rua of this radar in km if a target is located at a range of 50 miles
three vertical parallel straight rods each 26m in length have their upper ends firmly secured and their lower supporting a rigid horizontal bar with
1 given the data below design ia-32 instructions to copy data in array x to array y datax sdword 103040-10-20-4-50y
hodgkin-huxley fast subsystem1 explain why replacing the extracellular na with choline has little effect on the resting potential of an axon
schedule evaluationthe schedules are evaluated as per to the criterion weighted loss of slack now let t0si be the slack time buffer of job i as per
schedule selectionof the p excellent continuations q first operations are scheduled this offers p latest partial schedules after that step 1 is
schedule evaluationeach continuations of a partial schedule that are produced in step 1 are ranked as per to their respective cost function this cost
generation of continuationit is assumed that a partial schedule which may be empty schedule is given for this partial schedule a number of possible
restricted search over all possible schedulingall options to this approach aim to calculate a schedule for a specific number of operations and after
predictive control algorithmsescaping scheduling errors via partial look-aheadsince previously mentioned above the heuristic priority rules that are
newer approaches to on-line scheduling the on-line scheduling has established to be superior option than off-line scheduling upon the shop floor
results for the underlying problemthe rules mentioned above and several variants of these rules that became out to be inferior are tested for eight
theoretical resultsin the particular machine case several theoretical results are identified or can be deriveda if each operation can be scheduled
split queue rulesspt two queues prioritized as per to spt the operations for that tsj - u is negative form a high priority queue that is
combined rules mod modified operation due date
simple rulesfifo first in first out pnj tajspt shortest processing time pnj ojodd earliest operation due dates pnj tdjedd earliest job due date
priority rulesa main concern rule is an algorithm that evaluates a priority number pnj for all operation j which enters the queue in front of a
conventional priority rules the standard solution for production scheduling routing and sequencing difficulties is the utilization of priority
consider fully developed laminar flow with constant properties in a circular tube let there be heat transfered to or from the fluid at a
consider laminar flow in a circular tubewith a fully developed velocity profilelet the heat be added at a constant rate along the tube from x
problem typeaforementioned illustration relates to the class of non-cyclic scheduling problems characterized via the subsequent featuresa the
order sequences and order releasefor this system sequences of orders for particular parts batch size 1 are produced in the following way for each