Start Discovering Solved Questions and Your Course Assignments
TextBooks Included
Active Tutors
Asked Questions
Answered Questions
Transportation Model. The following table shows the number of planeloads of supplies available each day from each of six supply depots and the number
Roads for your construction company currently have three construction jobs in Northeast Florida requiring crushed lime rock.
Consider the following shortest-route problem involving seven cities. The distances between the cities are given below. Draw the network model for this problem
The following table provides shipping costs from each of two regional warehouses to each of three destinations.
Bill First, general manager of Worthmore Department Store, has estimated that every hour of customer time spent waiting in line for the sales clerk
Heights of women have a bell shaped distribution with a mean of 161cm and a standard deviation of 6cm.
Linear Optimization Model: Klein Industries manufactures three types of portable air compressors: small, medium, and large, which have unit profits
Muir Manufacturing produces two popular grades of commercial carpeting among its many other products.
A storage company has identified a new location to build climate-controlled storage units and rent them. Storage units will be built in three sizes
Given a transportation problem with the following costs, supply, and demand, find the optimal solution using the computer.
Helen Homes makes pottery by hand in her basement. She has 20 hours available each week to make bowls and vases.
The Southern Sporting Goods Company makes basketballs and footballs. Each product is produced from two resources - rubber and leather.
A jewelry store makes necklaces and bracelets from gold and platinum. The store has 18 ounces of gold and 20 ounces of platinum.
Dave Carter, the loading master for DeMonier International Cargo Company in New Orleans, LA, is responsible for preparing a loading plan for a freighter
Consider the following integer linear programming problem.
Joe is going to invest $250,000 in the development of new products. The new products have the following expected costs, yields, and degrees of risk.
Three quarries produce lime which is then shipped to five warehouses
State University has planned six special catered events for the Saturday of its homecoming football game.
A manufacturing firm produces diesel engines in four cities- Phoenix, Seattle, St. Louis, and Detroit. The company is able to produce the following numbers
Steel mills in three cities produce the following amounts of steel.
The Pyrotec Company produces three electrical products- clocks, radios, and toasters. These products have the following resource requirements.
Lowe's manufactures glass doors, windows, patio doors, and wood doors
The following linear programming model formulation is used for the production of four different products, with two different manufacturing processes
How much extra cotton and processing time are left over at the optimal solution? Is the demand for corduroy met?
The Crumb and Custard Bakery makes coffee cakes and Danish in large pans. The main ingredients are flour and sugar.