an injector is produced in two steps assembly and calibration this study will focus on the calibration area only the
management will purchase one more tool of any of the six tool types if that will help shorten makespan which tool
develop and test heuristics that embellish the operation clustering based assignment given in the previous problem for
assess the effect of operation clustering on machine loading operations are assigned to specific machines not just
simulate the following improved version of the shortest processing time first rule and compare the results with those
the model in this case study assumes that tools and parts can be moved concurrently to a machine modify the process
provide validation evidence for the fms machine loading simulation based on the tool and machine utilization compute
a flexible manufacturing facility must produce 1680 parts of one type per 80-hour lead wortman and wilson 1984 kleijnen
modify the model so that product occurs monday through friday at the current rate and saturday at half the current rate
include detection and response of the condition described in problem 3 in the model and resimulate the using the lower
one possibility that could arise during the simulation experiment is the following suppose a shipment of insufficient
a product inventory changes daily due to customer demand that withdraws from it and production that replenishes it on
modify the model and simulation experiment to give a profile of truck location estimate the average number of trucks in
modify the model and simulation experiment to estimate the needed capacity of the parking area for trucks at the
suppose that workers were available 24 hours per day but the total number of hours worked per day could not increase
modify the model presented in this chapter so that no worker inspects or repairs a truck during the off-shift period
compare the modeling and experimental issues of the logistics system discussed in this chapter to those concerning the
a new logistics system is being designed to transport one product from a factory to a terminal by rail a simulation
a company supplies a customer product for which daily demand expressed in truck loads is normally distributed with a
rerun the simulation model to collect verification and validation evidence this evidence could includea one table for
currently the model described in this chapter assumes that customers will accept backorders and late deliverys modify
modify the model so that the size of each rail fleet can be constrained to a pre-specified upper limit find the
suppose that the capacity of able plant is 62 rail cars per day in sum total over all products produced analyze the
evaluate the policy of shipping an amount equal to the expected customer demand from able plant to each of the other
instead of scheduling daily train arrivals at baker and chauncey plants as a part of the initial conditions discuss the