question develop a computer program which will determine the minimum rated size of air compressor required to service a
question 1 briefly describe the process of installing a shell pile2 briefly describe and contrast typical slope failure
question a power-shift crawler tractor is excavating tough clay and pushing it a distance of 95 ft 29 m maximum reverse
question using the data of problem calculate the expected production and unit cost of loading and hauling if the truck
question the scraper whose performance curve is shown in figure is operating at an altitude at which the derating
question the tractor-scraper whose travel-time curves are shown in figures 4-4 and 4-5 hauls its rated payload 4000 ft
question a hydraulic shovel will be used to excavate sandy clay and load it into 12-bcy 92-bcm dump trucks the
question 1 a wheel tractor-scraper whose weight on the driving wheels is 38720 lb 17563 kg has a gross weight of 70400
question 1 what type of compactor would you expect to be most suitable for compacting a clean sand2 list the four
question 1 estimate the production in compacted cubic yards meters per hour of a self-propelled tamping foot roller
question a highway contractor has opened a cut in a fine silty sand sm because of the cut location and lack of drainage
question twelve miles 192 km of gravel road require reshaping and leveling you estimate that a motor grader will
question the data in the accompanying table resulted from performing modified proctor tests on a soil plot the data and
question 1 write a computer program to calculate the time required hours for a motor grader to perform a finishing
questionnbsp1 trial blasting operations indicate that a rectangular pattern with holes 24 ft 64 m deep spaced on 1o-ft
question 1 what effect does increased air pressure at the drill have on drill production what limitations must be
question using the seismograph test data in the table find the seismic wave velocity and the depth of the upper
question estimate the hourly production and unit cost of rock excavation by drilling and blasting the rock is a
question you measure a seismic velocity of 8500 fts 2593 ms in limestone would you expect this rock to be ripable by a
question 1 briefly explain the difference between construction utilizing a conventional construction contract and
1 assessment detailsthe purpose of this assignment is to build your practical understanding of portfolio op- timization
question 1 a 100d-ft 305-m-long pipeline requires an excavation 4 ft 12 m wide to an average depth of 5 ft 15 m if the
question 1 in making a field identification test of a soil you find that less that 50 by weight of the coarse fraction
part a -choose a specific incident from your life that you could have handled more effectivelyanalyse the incident and
question using table how many working minutes per hour would you expect to achieve on a project whose job conditions