You are given a drawing. The drawing's title is "Aligned Shaft, Date: 10/01/07". Calculate the total height of the assembled components.
EG7035 Digital Construction and BIM: Ensure the concepts of Building Information Modelling and are able to create 3D model of a building by Autodesk Revit.
By equivalent seismic load method, check the Torsional Irregularity and Interstorey Stiffness Irregularity (Soft Storey) for the building.
ENGIN2503 Surface Mining Operations and Equipment: Explain various deciding factors related to choice of surface mining over underground mining methods.
EMS5CE - Cost Engineering: Your tasked to create a pre-tender estimate of the cost to produce and deliver the 'LTU Swiper'.
Draw the flow net on graph paper. Calculate the flow rate under the weir. Calculate the pore water pressure at point A shown in Figure 1.
The topic is: A framework towards sustainable construction: Barriers, best practices and its implications on the built environment
Develop a physical design for the intersection, that is, how many lanes and what channelization for the lanes. Develop a complete signal timing plan
Determine the stresses at point A which is directly below point C and at the midpoint of the sand stratum.
Need a literature review of 25 summarized reports for a bachelor project. Barriers, best practices and its implications on the built environment.
Investigate and diagnose building defects; and establish a building's overall state of repair and prepare schedules of condition and dilapidations
1) Identify appropriate construction methods for framed buildings. 2) Comprehend and display graphically, construction methods for framed buildings
Q1. Investigate the problem and build a plan for the numerical analysis. Q2. Build the solution procedure. - Provide the pressure field.
Carry out mix design for M35 grade concrete as per IS 10262. The properties of constituent materials and other parameters are stated below in the tables.
1 aimthe assignment aims to develop the ability to analyse evaluate research plan and manage a major building project
civilyou are provided with bill of quantities prepared separately priced and submitted by 3 con- tractors abc found on
the drainage system of a cantilever wall shown in below figure became blocked after a heavy rainstorm and the
assignmenta continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as
aimthis assignment aims to demonstrate the structural design requirements of a glazed faccedilade in a multi-storey
masonry design assignmentquestion 1 - derivation of seismic actions on buildinga determine the storey seismic weights
task details the client is doing masters in civil engineering he needs a technical paper on earthquake pertaining to
assessment taskpractical investigationinstructions- it is very important that you read these instructions- the hardcopy
assignment -ewb design report format - cover page - the as ewb project table of content introduction about -ewb and