You need to make company with three branches one of them head office to make it support for ABC company using packet tracer
Design and Implementation of Network between company head office and the branches of it and it security.
The aim in this project is the work of the design help resolve network requirements in Company, and is working to help all staff their communication process between the branches and to implement all security measures in order to make the network reliable.
Objectives
The main objectives are:
- Action Plan suitable for network and the company's needs.
- Improving the existing local area networks of five branches by redesigning
- Design and for current local head office in order to be allowed to install additional servers.
- Design and Implementation of the suitable Wide area network technology.
- Provide security between the branches and within the individual networks.
Table of Contents
Chapter 1
Introduction
1.1-Project Background. 4
1.2 Motivation.
1.3 Aim.
1.4 Objectives
1.5 Scope of the project:-
1.6 Problem Statement:
Chapter 2
Literature Review
Introduction
2.1 Wide Area Network
2.2 Site-to-site VPNs
2.2.1 Dynamic Multipoint VPN
2.2.2 Easy VPN
2.3 Other hardware do I need
2.4 Ethernet
2.5 (Network Interface Card NIC)
2.6 Role Hub distributor and Operator Switch:-
2.7 VOIP:-
2.8 Summery
Chapter 3
Analysis
3.1 Interview
3.1.1 Summery of the interview
3.2 Questionnaire.
3.3 Requirements Specifications
3.3.1 Functional requirement.
3.3.2 Non-Functional requirements
3.4 Cost Analysis
Chapter 4
Design
4.1 Changes the LAN (Local Area Network):
4.2 LAN (Local Area Network) at the remote sites:
4.3 WAN (Wide Area Network):
4.4 IP address Table:
4.5 Test Plan:
Chapter 5
Implementation
1. Route:-.
2. Switch:-
3. PC:-
4. VOIP:
Chapter 6
Testing
» PC 1 (192.168.5.10) can access to FTP & WEB. 34
» PC 2 (192.168.5.20) can access to EXCH & data & DNS. 35
» 192.168.2.0 Network can access to all servers. 36
» PC 7 (192.168.3.10) can access to all servers. 36
» PC 8(192.168.3.20) can't access to all servers. 37
Chapter 7
Project Management
7.1 Outline:-
7.2 Project Gant Chart:-
7.3 Project Milestone:-
Chapter 8
Evaluation and conclusion and references
8.1 Evaluation
8.2 Conclusion
8.3 References