You have a demand for 150 units and you're Material Requirements Planning Software shows the following inventory levels for the various components that are part of the finished product.
MRP Level Quantity Netted Requirements
Level 0 27
Level 1 Subassembly A 42
Level 2 Subassembly B 24
Level 3 Subassembly C 52
Level 1 Subassembly D 33
Level 2 Subassembly E 42
Level 3 Subassembly F (2 each) 18
Level 2 Subassembly G 60
Level 1 Subasembly H 32
a. Complete the "netted" Requrements in the table above. Subassembly G has a 90% reliability but all of your stock (inventory) is acceptable?