You are on the design team for building an overhead bridge crane for use in-house within the company. The design team is considering a proposal to place a switch box on the wall with toggle on/off switches for control of the bridge, trolley, and hoist, respectively. What would be your design input to this committee?
Explain the rationale behind your recommendations.