Write a report to develop a worksite traffic management plan for a four-lane two-way arterial road. In you plan include:
- The eight steps of worksite traffic management processes
- The location of lead vehicle, work vehicle, shadow vehicle and tall vehicle
- Different traffic control elements specifying their dimensions
- Appropriate drawing tools such as AutoCAD (drawings on the road and where vehicles will be placed)
- Please use all Australian standards and codes