With these two control charts analyze and find the trends


With these two control charts, analyze and find the trends on each. Determine the success or failure. The scenario is that the check-in time is 4 minutes or less and the check-out time is no more than 2 minutes at a hotel. In the previous setting, the check in time had an average of 4.85 minutes and the check in time had an average of 3.29 minutes. A new control chart was created for the check-in and check-out time with improvements.

Guest------Check-In Time in Minutes: 2.52; 3.17; 2.3; 2.53; 2.57; 2.43; 3.92; 3.27

Guest 1-8----Check- out Time in Minutes: 1.5; 0.67; 1.4; 1.17; 1; 1.67; 1.95; 0.83

Please graph and evaluate!

Request for Solution File

Ask an Expert for Answer!!
Operation Management: With these two control charts analyze and find the trends
Reference No:- TGS01063936