3,000 widgets must be machined on workstation throughout week. Each widget is identical and requires the machining cycle time (Tc) of 36.5 minutes. All of machining centres in shop are equally able of producing widgets in specified cycle time.
Q: How many machining centres should be devoted to widget production throughout the given week, if there’re 90 hours of accessible time on each machining centre? (Show all work)