Assignment: Supplier Quality Challenge - Incoming Receiving Inspection
Create a 10- to 12-slide visual presentation, with speakers' notes, that outlines the components of a receiving inspection plan.
Select a commodity to use as your example. Possible commodities include:
• Electrical components used in smartphone assembly
• Bulk food products, such as grains and liquids
• Mechanical components for industrial tool manufacturing
• Wiring components used in aerospace manufacturing
• Textiles used in clothing manufacturing
Develop a receiving inspection plan for suppliers of the selected commodity based on the following criteria:
• Newly sourced supplier
• Existing sourced supplier
Analyze why this criteria is important to the receiving inspection plan strategy.
Assess the critical inspection elements to be considered when developing the plan, including the following:
• Incoming lot inspections
o Sampling
o Frequency
o Lot containment
o Data management
o Special handling considerations
o Supplier notifications
• Disposition of non-conforming material
o Supplier returns
o Scrap
o Sorting
Include a process map of the incoming receiving inspection process.
Format your assignment according to the following formatting requirements:
1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.
2. The response also include a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.
3. Also Include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.