Problem
In engineering economic analysis of projects, when using Net Present Worth or Benefit/Cost ratio we have to equalize the lives of the projects. This equalization is not necessary when using EUAW methods. Why? Can you show this using a cash flow diagram?
The response should include a reference list. Double-space, using Times New Roman 12 pnt font, one-inch margins, and APA style of writing and citations.