Which one of the following projects should you accept?
a. A project with an IRR of 11.6 percent and a required return of 11.5 percent.
b. A project with an NPV of -$3,091.
c. A project with a PI of 0.87
d. A project with a payback period of 2.6 years and a required period of 2.5 years.