Which of the statements below describes the IRR decision criterion?
The decision criterion is to reject a project if the IRR exceeds the desired or required return rate.
The decision criterion is to accept a project if the NPV is positive.
The decision criterion is to accept a project if the IRR falls below the desired or required return rate.
The decision criterion is to accept a project if the IRR exceeds the desired or required return rate.