Which of the following would be considered a project: (a) construction of a hydroelectric dam; (b) operation of a nuclear reactor; (c) development of an engine for the B-2 bomber through the first production prototype; (d) a production order for an additional twenty F-15 aircraft? Explain. No more than 1/2 page.