Which of the following is properly attributable to the cost


Which of the following is properly attributable to the cost of land?

            A. The cost of paving a parking lot.

            B. The cost of lighting the parking lot.

            C. The cost of fencing around the parking lot

            D. The cost of razing an existing building to make way for the parking lot.