1. Which of the following is one of the main advantages of back schedule compared front schedule?
Reduce work-in-process inventory and minimize storage time of completed components
back schedule requires less data and simpler system
Lower production cost and material cost
Increase service level
2. Which of the following is INCORRECT about lot sizing in Theory of Constrains systems?
a process batch is the total lot size released to the shop
a transfer batch is the quantity that moves from operations to operations
Transfer batches can provide work centers with flexibility, such as, lot splitting and overlap.
Original process batch is integral fractions of transfer batches
3. Which of the following is INCORRECT about lot sizing in Theory of Constrains systems?
a process batch is the total lot size released to the shop
a transfer batch is the quantity that moves from operations to operations
Transfer batches can provide work centers with flexibility, such as, lot splitting and overlap.
Original process batch is integral fractions of transfer batches