You are the contracting specialist working in the installation contracting office. This morning you received two PR packages. One package is for a requirement for a specialized tool used by the installation civil engineer electrical shop with an estimated cost of $17,250. The other package is a requirement for a repair of main power unit on the base steam system for an estimated $53,550. You scrutinize both requirements to determine the publicizing needs for both. According to FAR 5.101, which of the following is a true statement regarding the results of your analysis of the two requirements?