1. When using a "level capacity strategy" or “level production strategy” in aggregate planning, variations in demand are met by using which of the following options?
I. varying output during regular time without changing workforce size (for example, using overtime)
II. varying output during regular time by changing workforce size
III. varying inventory levels
2. Can collaboration and partnership address the problem of improving the quality of services or is it simply a cost cutting strategy?