When raw material be reordered if acceptable risk is given


A certain raw material is restocked using a reorder point approach. Lead time is 6 days. Usage of the material during lead time is normally distributed with a mean of 42 pounds and a standard deviation of 4 pounds. When should the raw material be reordered if the acceptable risk of a stock out is 3%?