True/False
1. When a project is somewhat similar to an old project, it is a good idea to use the exact same plan(project?) over again.
2. The scope statement specifies the main areas of work to be performed, and the intended deliverables for n times.
3. At least two scope statements might exist for a project, one for the customer and one for the contractor.
4. A work package is used as the basis for developing a Work Breakdown Structure.
5. The purpose of the WBS is to divide the project into pieces so it can planned, budgeted, and scheduled.
6. A task, or activity, is represented on a Activity On Node (AON) network as a line connecting its start and finish events.