A company has configured a production line with five stations, each having an average processing time of 15 minutes with a standard deviation of 10 minutes.
(a) What would be the hourly production rate of this line if there was no variability (i.e. standard deviation = 0)?
(b) What size of buffer should they use to ensure a production rate of at least 28 parts per 8 hour day?