In June, the activity level was10,000 units, variable costs equal $40,000, fixed costs equal $50,000, and mixed costs = $15,000. In July, the activity level increased to 12,000 units and total costs equal $115,000. Assuming that these activity levels are within the relevant range, what were the mixed costs for July?