What was the original information what change was made


Assignment: Object-Oriented Design

Deliverable Length: 3-4 Pages.

In the previous weeks, you were asked to create the use case model, class diagrams, sequence and collaboration diagrams, and activity and state diagrams for an ordering system. After further review, it has become clear that modifications to the ordering system need to be considered. The new requirement is to provide the ability for an outside party to read existing orders. You are tasked with designing and documenting the add-on functionality that is needed to allow the outside party to read the orders.

Complete the following:

• All of the original models should be updated to reflect this new requirement: use case, class, state, transition, activity, sequence, and collaboration diagrams. The updated models should reflect the new requirements.

• Object-oriented recap:This week, you will recap the use of each model in the design and answer the following question:

o Now that you have created and revised the design, how did you feel that the object-oriented methodology with Unified Modeling Language (UML) enhanced the process of developing the system design? Please provide a 1-page document.

• Throughout the development of the models, you have made changes to your models based on feedback from your instructor and possible discoveries as you progressed through the design. Create a change control document that documents these changes. This does not need to include the changes made for the new requirement this week. It should include other changes made throughout the project. Please include the following for each change that you made:

o What was the original information?
o What change was made?
o Where is the change located in the document?
o Why was the change needed?

Project Deliverables

Complete the following:

• Update the object-oriented design document title page with the new date.
• Update the previously completed sections based on instructor feedback.

o Update all of the design models to reflect the new requirements.
o Use case
o Class
o Sequence and collaboration
o State transition and activity

• Change control document for changes made to model prior to Week 5

o What was the original information?
o What change was made?
o Where is the change located in the document?
o Why was the change needed?

• Object-Oriented Design Recap

o Recap of each model used in the design

o Now that you have created and revised the design, how did you feel that the object-oriented methodology with UML enhanced the process of developing the system design?

• This week's project is the final Key Assignment, and it should contain all of the models with updates based on feedback received from your instructor and classmates.

• Be sure to update your table of contents before submission.

Please submit your assignment.

Adhere to APA formatting and reference guidelines when writing your response. Additionally, your response should be free of grammatical errors, use complete sentences, and give specific details to support statements.

Attachment:- Murphyjerry_ip.zip

Solution Preview :

Prepared by a verified Expert
Programming Languages: What was the original information what change was made
Reference No:- TGS02267836

Now Priced at $40 (50% Discount)

Recommended (94%)

Rated (4.6/5)