Budgeted level of activity 5,500 MHs
Actual level of activity 6,800 MHs
Cost formula for variable overhead cost $4.50 per MH
Budgeted fixed manufacturing overhead cost $48,300
Actual total variable overhead $28,600
Actual total fixed manufacturing overhead $42,100
What was the fixed manufacturing overhead budget variance for the month?