Assignment: Project Estimating and Control Techniques
Length: 1050 to 1400 words.
Review the JP Phentar Construction: Case Study in Ch. 11 of A Comprehensive Guide to Project Management Schedule and Cost Control and Review Questions Guide.
Complete the following:
o Determine which information-gathering tools would be most effective for this project and what activities would need to be monitored.
o Based on data that would be generated from work activities, what types of analytical tools could be used to determine project status?
o Can any corrective actions be initiated? And if so, how?
Format your assignment according to the following formatting requirements:
o The answer should be typed, using Times New Roman font (size 12), double spaced, with one-inch margins on all sides.
o The response also includes a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.
o Also include a reference page. The Citations and references must follow APA format. The reference page is not included in the required page length.