Power generation using wind energy is reciving increased attention in the united states and worldwide. For a proposed wind energy power generation site near cape cod, MA that has a sustained average wind speed of 12 m/s, (a) determine the required minimum rotor diameter if the unit is to produce 1 MW. (b) What rotor diameter is needed if the wind energy conversion is 38%? Use an average temperature of 15 C.