What might happen if insufficient time were left near end


Discussion Post: Software Test Plan

Software test plans identify specific features that need to be tested, how they need to be tested, and to what extent they need to pass the identified tests.

Respond to the following in a minimum of 175 words:

a) What are the ramifications of stringent testing criteria vs. lax testing criteria?
b) What might happen if insufficient time were left near the end of a project to conduct testing?
c) What are some situations or features for which testing might not be required at all?

The response should include a reference list. Using one-inch margins, Times New Roman 12 pnt font, double-space and APA style of writing and citations.

Solution Preview :

Prepared by a verified Expert
Software Engineering: What might happen if insufficient time were left near end
Reference No:- TGS03142344

Now Priced at $25 (50% Discount)

Recommended (92%)

Rated (4.4/5)