Discussion Post: Project Management
• Construct the Work Breakdown Structure of this project, including Tasks, times, resources, and predecessors.
• Draw the Project Timing with a Gantt Chart and a PERT or Network Diagram. What is the total project completion time?
• Determine the Critical Path.
• Draw the Resource Graph. What are the maximum and minimum resource needs?
The response must include a reference list. Using Times New Roman 12 pnt font, double-space, one-inch margins, and APA style of writing and citations.