What is the standard cell potential of a cr-hg cell
What is the standard cell potential of a Cr-Hg cell? (Remember to switch one-half reaction to oxidation and to balance the number of electrons--use paper.)
Cr3+(aq)+ 3e- → Cr(s) Eo = -0.74 VHg2+(aq)+ 2e- → Hg(l) Eo = +0.789 V
Expected delivery within 24 Hours
A quantity of N2 originally held at 3.80 atm in a 1.00L container at 26oC is transferred to a 10.0L container at 20oC. A quantity of O2(g is originally at 4.75 atm and 26oC in a 5.00L container is transferred into the same container. What is the t
Calculate the standard cell potential (E^circ) for the reaction rm X {(s)}+ rm Y^{+}{(aq)} rightarrow rm X^{+}{(aq)}+ rm Y {(s)}
A first-stage recovery of magnesium from seawater is precipitation of Mg(OH)2 with CaO: What mass of CaO, in grams, is needed to precipitate 1000lb of Mg(OH)2?
If 43 g of hot water at 85°C is poured into a cavity in a very large block of ice at 0°C, what will be the final temperature of the water in the cavity?
The standard free energy change for the formation of N2H4(l) from elements is +149 kJ/mol at 25 °C. What is the equilibrium constant for the reaction? (R = 8.314 J/K·mol)
a solution which is 37.2 mass% hcl has a density of 1.19g/ml.what mass of hcl is contained in 30.0ml of a solution.
Atmospheric pressure is 29.86Hg. What is the absolute pressure in psia being measured? The density of mercury at 70F is 13.543g cm^-3.
when 50.0 grams of acetylene is allowed to react with excess oxygen, 75.0 grams of CO2 are formed. What is the percent yield of carbon dioxide?
1928307
Questions Asked
3,689
Active Tutors
1424370
Questions Answered
Start Excelling in your courses, Ask a tutor for help and get answers for your problems !!
you will create a PowerPoint presentation to Q1) Explain the origin, purpose, and goals or rationale of action research in education.
One of the biggest criticisms of state standardized tests is that they only use multiple-choice questions and test basic knowledge of a subject.
Charles Parker, network administrator at Future Technology (FT), has been given the responsibility of relocating the large data center to a new office building
Topic: Stakeholder Management Plan for the Employee Training Program. The resource management plan should include the following elements:
Analyze how project integration management is used in traditional project management versus agile project management.
Discuss the instrument you intend to use in your research proposal and how you intend to address the instrument's validity and reliability noting
According to The American Psychological Association (APA, 2012), four broad categories of factors work against adequate student achievement in schools