Assignment: System Engineering Methods
Length: 1000 words.
1) What is the purpose of the SEMP? When in the life cycle should it be developed? How does it relate to each of the following:
a) the PMP
b) the reliability program plan
c) the integrated logistic support plan
2) Select a system of your choice and develop a detailed outline of a SEMP for your system.
3) What is the purpose of the WBS? What is the difference between an SWBS and CWBS?
If you were outsourcing and responsible for specifying the work requirements for a supplier, which would you use?
Format your assignment according to the following formatting requirements:
1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.
2. The response also include a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.
3. Also Include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.