Problem: Wholesale company produces circuit breaker containers. The machine operator stamps 15 containers from each strip of aluminum. Each strip costs $1.15. The operator can stamp 540 containers per hour. The direct labor charge is $17.85 per hour. What is the prime cost of manufacturing a circuit breaker container?
a. $.32
b. $.03
c. $.13
d. $.11
e. Not given