a. What is the overhead rate per inspection if the number of inspection is used as a single cost driver under traditional costing system?
b. Utilizing traditional costing, how much overhead is assigned to the order based on inspection activity as a single cost driver?
c. Utilizing ABC, how much total overhead is assign to the order?
d. Which method you recommend?