What is the normal time and standard time


Peter Rourke, a loan processor at Wentworth Bank, has been timed performing four work elements, with the results shown in the following table. The allowances for tasks such as tis are personal. 7%; fatigue, 10%; and delay, 3%

TASK          PERFORMANCE        OBSERVATIONS (MINUTES)
ELEMENT       RATING (%)          1        2        3       4         5

1                      110                   5        4        6       4         4
2                        95                   6        8        7       6         7
3                        90                   6        4        7       5         5
4                        85                 1.5      1.8     2.0    1.7       1.5

a) What is the normal time?

b) What is the standard time?