A medical equipment manufacturer subjected 100 pacemakers to 5000 hours of testing (all running simultaneously). Four of them failed after:
1,059 hrs
1,614 hrs
3,747 hrs and
4,130 hrs of operation respectively.
What is the mean time before failure (MTBF) of these types of pacemakers (calculate to rounded hours).