Characteristics of Production Process, Cost Measurement
Vince Melders, of EcoScape Company, designs and installs custom lawn and garden irrigation systems for homes and businesses throughout the state. Each job is different, requiring different materials and labor for installing the systems. EcoScape estimated the following for the year:
Number of direct labor hours 6,810
Direct labor cost $61,290
Overhead cost $57,885
During the year, the following actual amounts were experienced:
Number of direct labor hours 6,015
Direct labor incurred $60,150
Overhead incurred $56,059.80
Required:
1. Should EcoScape use process costing or job-order costing?
2. If EcoScape uses a normal costing system and overhead is applied on the basis of direct labor hours,
What is the overhead rate? Round your answer to the nearest cent.
What is the average actual wage rate?
What is the cost of an installation that takes $3,360 of direct materials and 30 direct labor hours?