What is the capacity of the system and what is bottleneck


Operation Management Assignment

Go to the page entitled "Problems" at the end of chapter 6 in the textbook (e-book).

Read the problem number 6, about the furniture factory, and answer the following questions.

a. What is the capacity of the system and what is the bottleneck?

b. What are the throughput times for batches of large and small tables.

c. When producing at a rate of six small tables per hour on average, how many tables will be in the system?

d. Draw the flowchart.

Format your assignment according to the following formatting requirements:

1. The answer should be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

2. The response also include a cover page containing the title of the assignment, the student's name, the course title, and the date. The cover page is not included in the required page length.

3. Also Include a reference page. The Citations and references should follow APA format. The reference page is not included in the required page length.

Solution Preview :

Prepared by a verified Expert
Operation Management: What is the capacity of the system and what is bottleneck
Reference No:- TGS02972373

Now Priced at $50 (50% Discount)

Recommended (91%)

Rated (4.3/5)