What is the capacity of the process


Problem

Consider the following batch flow process consisting of three process steps performed by three machines.

 

Step 1

Step 2

Step 3

Processing time

2 mins/unit

3 mins/unit

1.5 mins/unit

Setup Time

20 mins

No setup

No setup

a) Assume that the batch size is 10 parts. What is the capacity of the process?
b) For a batch size of 50 parts, which step is the bottleneck for the process?
c) What is the ideal batch size (i.e. one that minimizes inventory without affecting process capacity)?