Weaver Company's predetermined overhead rate is $21.00 per direct labor-hour and its direct labor wage rate is $12.00 per hour. The following information pertains to Job A-200:
|
|
Direct materials |
$220 |
Direct labor |
$60 |
|
1. |
What is the total manufacturing cost assigned to Job A-200?
|
Total manufacturing cost |
$ |
2. |
If Job A-200 consists of 30 units, what is the average cost assigned to each unit included in the job? (Round your answer to 2 decimal places.)
|