A jewelry store determines that the average demand for a diamond necklace it keeps in stock is 4 per period and the average demand during lead time is 3 per period. What is the standard deviation of demand during replenishment of the necklace if the standard deviations of demand per period and lead time are 1.2 and 1.5 respectively?