1. Explain some causes that would make the control chart pattern follow a gradually increasing trend.
2. What is meant by an overall type I error rate? If Rules 1, 2, and 3 of this chapter are used simultaneously, assuming independence, what is the probability of an overall type I error if 3σ control limits are used?